COMBINED MOTOR-LOAD PLAN · OCTOBER 2026

Protect the basement and the refrigerator at the same time.

A sump pump plus refrigerator plan is constrained by two motor starts and an uncertain wet-weather duty cycle. The station must survive startup while other loads are already running.

This example cannot predict your inflowThe pump’s on-time can change dramatically during a storm. Measure a representative wet-weather cycle and plan redundancy; do not size flood protection from the example alone.

Example inputs

LoadRunning wattsDuty cycleHoursDevice startup
Sump pump800 W25%122,000 W
Refrigerator150 W33%121,200 W

At these illustrative duty cycles, the loads consume 2,994 Wh before conversion losses. The sump pump dominates the energy budget; doubling its on-time nearly doubles the required battery.

What the example produces

The startup requirement assumes the sump pump starts while the refrigerator is already drawing its running watts.

Battery capacity3,950 Wh
Continuous output1,200 W
Startup requirement2,150 W
Load this editable plan →

Why the startup math changes

Looking only at the pump’s 2,000-watt startup value ignores anything already operating. The plan adds the pump’s startup increment—startup watts minus its own running watts—to the simultaneous running total. If both compressors could start together, test the real combination or use a more conservative engineering assessment.

A portable station is not complete flood protection

Battery capacity does not address a jammed pump, failed float switch, excessive inflow, flooded equipment, unsafe extension wiring, or an empty battery. Consider alarms and an independent backup method appropriate to the property. Never backfeed house wiring through a receptacle.

Measure before buying

  1. Record exact pump nameplate information and manual requirements.
  2. Measure running watts and seconds per cycle during representative inflow.
  3. Count cycles per hour during the condition you need to survive, then use the sump-pump runtime calculator to check the pump by itself.
  4. Measure the refrigerator separately over 24 hours.
  5. Confirm output, surge behavior, grounding, GFCI behavior, and cable ratings with qualified guidance.

Sources and next steps