Average the load
Running watts × quantity × duty cycle gives each device’s average demand.
Σ watts × qty × dutyBuild your essential-load plan. We’ll estimate the battery capacity, continuous output, and startup surge your backup power needs—without pretending every outage looks the same.
Start with a preset or add your own device. Replace representative values with the wattage from your equipment label or a power meter whenever possible.
Enter one exact station and a realistic daily recharge window. We’ll compare the repeated load schedule above with the energy available across a longer outage.
This repeats the device schedule above once per day. Recharge input must be the power the station actually accepts—not a panel or generator headline. The result is an energy budget, not proof that charging and load timing will work. Never operate a fuel-burning generator indoors or in a garage.
* For CPAP or other medical equipment, use this only for general energy planning. Follow the device manufacturer’s approved backup-power guidance and maintain an appropriate emergency plan.
0 of 27 current models meet both the calculated battery-capacity and continuous-output minimums. Surge compatibility is shown separately when the manufacturer publishes a rating.
Affiliate disclosure: Power Prep Labs may earn a commission from clearly labeled shopping links, at no extra cost to you. Paid relationships never change the calculator thresholds or model order. No paid links are currently active.
| Model | Capacity | AC output | Surge check | Weight | Source | Shop |
|---|---|---|---|---|---|---|
| Loading verified model data… | ||||||
A model appearing here is not a recommendation or guarantee. The matcher does not yet evaluate voltage, waveform, ports, grounding, transfer equipment, environmental limits, or every manufacturer restriction.
Compare any three current models against the same load →Our estimate separates power, energy, and motor startup—three numbers that product roundups often blur together.
Running watts × quantity × duty cycle gives each device’s average demand.
Σ watts × qty × dutyAverage demand × required hours gives raw energy before conversion losses.
average watts × hoursEfficiency and reserve turn ideal energy into a practical minimum battery capacity.
raw Wh ÷ efficiency ÷ usable %Motors can briefly draw far more than their running watts. The station must clear continuous and startup tests.
running load + largest startup incrementBrowse calculation-first guides by protected load, measurement task, exact model, or supporting outage accessory.
Plan for cycling loads, compressor surge, food safety, and realistic outage duration.
Read the field guide →Turn a plug-in meter reading into average watts, duty cycle, outage energy, and a battery-capacity starting point.
Open the worksheet →Compare documented meter features, ratings, memory behavior, and the limits of consumer startup readings.
Compare four meters →Compare five local, Bluetooth, and Wi-Fi monitors by sensor layout, alert path, history, range, and outage role.
Compare temperature alarms →Compare five rechargeable, dual-fuel, hand-crank, power-bank, and replaceable-battery lighting strategies.
Compare outage lanterns →Compare five models by receive-only weather band, automatic NOAA alerts, SAME filtering, backup power, charging, and lighting.
Compare weather radios →Start with safe placement, then compare runtime, startup, noise, fuel, recharge, and a transparent 24-hour example.
Choose the backup approach →Convert measured kWh and station capacity into usable energy, estimated hours, and a target-duration margin.
Estimate refrigerator runtime →Compare rated-capacity targets across three measured daily-energy examples and three outage durations.
See the capacity table →Compare 17 current systems by capacity, output, surge evidence, weight, and measured-energy scenario fit.
Compare current systems →
Why horsepower, water inflow, and startup current change the answer.
Read the field guide →Compare shared household energy with a purpose-built second pump, independent switch, controller, alarms, and failure coverage.
Choose the backup architecture →Keep full-load amps, locked-rotor amps, VA, measured inrush, and station surge watts from becoming one misleading number.
Screen motor startup →Convert wet-weather cycle length and frequency into average load, capacity needed, runtime, and rating headroom.
Estimate sump-pump runtime →Find the gaps between drainage, the primary pump, independent backup pumping, emergency energy, and alerts plus response.
Check all five layers →See how three wet-weather duty cycles change the rated-capacity target across 6, 12, and 24 hours.
See the duty-cycle table →Compare 12 current systems by capacity, output, surge evidence, weight, and transparent scenario fit.
Compare current systems →Separate voltage, running load, motor start, energy, and installation instead of relying on one wattage headline.
Screen the exact pump →Compare five current systems by native voltage, capacity, continuous output, start evidence, outlet limits, and installed path.
Compare current systems →
Choose the correct path for a gas furnace, hydronic boiler, pellet stove, heat pump, or electric resistance heat.
Choose the winter backup path →Calculate from measured whole-furnace watts and heating duty cycle, then keep startup and hardwired transfer requirements visible.
Estimate furnace backup →Separate standby, burner and control, and active circulation watts, then screen energy, startup, waveform, and the hardwired transfer path.
Estimate boiler backup →Compare eleven current base units by planning runtime, output, surge evidence, weight, and the separate connection gate.
Compare gas or oil boiler-backup systems →Separate sustained ignition demand from steady burn energy, then screen waveform, transfer behavior, and combustion safety.
Estimate pellet-stove backup →Compare eight current systems by planning energy, output, startup evidence, weight, transfer behavior, and connection limits.
Compare furnace-backup systems →Compare four True-RMS meters with documented inrush capture, safety categories, access options, and HVAC features for qualified measurement.
Compare inrush clamp meters →Silent, indoor-safe backup plans for renters with limited storage.
Read the field guide →Estimate overnight energy while preserving the manufacturer’s safety boundaries.
Read the field guide →Combine two separate overnight measurements, outage nights, conversion loss, reserve, and other essential energy without assuming identical devices.
Open the two-device worksheet →Trace and measure the modem, ONT, router, switches, mesh nodes, and essential work device before choosing a UPS or larger battery.
Build the minimum online stack →Compare portable-station switchover claims with dedicated UPS topologies and test the exact load.
Understand the tradeoffs →Compare five manufacturer-listed models by watts, waveform, transfer time, battery-backed outlets, and load-specific runtime evidence.
Compare UPS systems →Combine measured or first-party planning watts with other network loads, outage duration, efficiency, and reserve to calculate runtime and capacity.
Calculate Starlink backup →Compare conservative rated-capacity targets for Mini, Standard, and Performance hardware across three outage durations.
See the Starlink capacity table →Understand watts, watt-hours, duty cycle, reserve, losses, and startup surge.
Read the field guide →Use exact input watts and cooling duty cycle to estimate runtime and capacity while keeping compressor startup as a separate evidence gate.
Estimate room cooling backup →Compare 13 current systems against one disclosed cooling load, with capacity, runtime, startup evidence, weight, and manufacturer limits kept separate.
Compare room-AC backup systems →Choose the correct calculator and commercial comparison for refrigerators, pumps, furnaces, internet, Starlink, or several essentials.
Start the comparison path →Apply the same load, efficiency, and reserve to any current systems, then inspect capacity, output, surge evidence, runtime, weight, transfer claims, and source dates.
Build a model comparison →Compare 27 current systems by rated watt-hours, published AC output, weight, and calculated watt-hours per pound—with every primary source visible.
Explore the dataset →Compare the original 1,056 Wh C1000—not Gen 2—with DELTA 3 Plus using source-dated specs and editable runtime math.
Compare the exact models →See why identical 1,024 Wh base capacity means equal planning runtime—and when output, a fourth outlet, or expansion makes the Plus different.
Compare the exact models →Compare base capacity, rated output, solar input, weight, expansion, and editable runtime under the same load assumptions.
Compare the exact models →Compare an expandable 2,048 Wh base with a stronger fixed 3,072 Wh base—and see when the first expansion pack reverses the weight advantage.
Compare expansion with the fixed base →Test the lighter 2 kWh base and stronger 3.6 kWh base against one measured load, duration, efficiency, and reserve target.
Compare the expandable bases →Compare two nearly equal batteries by output, solar input, expansion, weight, transfer claim, and editable runtime math.
Compare the exact models →Compare the stronger solar and continuous-output path with the much lighter station using one editable load plan.
Compare the exact models →Compare identical capacity, output, and surge headlines by expansion, solar input, transfer, ports, size, and portability.
Compare the exact models →See what the extra 512 Wh, battery expansion, two-unit 240 V path, and 17.6 lb weight difference mean under one measured load.
Compare the exact models →Compare three high-ticket home-backup systems by base capacity, output, surge evidence, solar, expansion, transfer behavior, and weight.
Compare the 120/240 V systems →Choose meters, temperature alarms, UPS systems, panels, lanterns, and radios by the job they add—not by bundle size.
Build the supporting kit →Estimate 120 V conductor drop by appliance watts and one-way length, then compare source-verified outdoor cord ratings.
Screen the extension cord →Compare four current outage-capable power strategies, screen exact models for recalls, and keep generator placement non-negotiable.
Choose the alarm power path →Compare six local and remote detection paths by sensor layout, power, gateway dependence, and water-exposure boundary.
Compare leak alarm paths →Compare usable planning energy, runtime, output, weight, and the current models in each class.
Compare capacity classes →Apply efficiency and reserve, estimate runtime, solve for required capacity, and compare nine assumption combinations.
Calculate usable energy →Embed a responsive, privacy-safe energy and runtime calculator with transparent assumptions, safety limits, and visible source attribution.
Preview and copy the embed →Convert battery state of charge, panel watts, expected yield, charge efficiency, and full-sun hours into a weather-dependent recharge plan.
Estimate solar recharge time →Compare eight current portable panels by rated power, voltage, current, weight, folded size, and the recharge target they may serve.
Compare portable solar panels →Calculate array voltage, current, and watts, apply a cold-condition Voc factor, and screen the result against entered station-input limits.
Screen a proposed solar array →Check recalls, inspect equipment, prove noncritical and combined loads, measure a runtime slice, verify recharge, and copy or print the record.
Open the 14-point checklist →Work through a transparent 24-hour essentials example, then replace every input.
Open the outage plan →See why simultaneous running load and the largest startup increment both matter.
Open the outage plan →Size a 24-hour food plan alongside a focused 10-hour workday, then edit every assumption.
Open the outage plan →Compare six expandable, high-output systems without confusing base capacity, total output, or surge claims.
Compare verified models →We distinguish manufacturer claims, calculated estimates, and our own measurements.
If a link can earn us money, we say so where you can see it.
Commission rates do not decide which product fits a scenario.